Description
The houses and the barn are mostly built after the reconstruction that took place in 2003-2008.The complete electricity, water, waste, replacement of windows, plaster, flooring, complete main building, part of the second building, roof shed.The total technical area of the land is 7880 m2.The total area of the house is 715 m2.The total area of the house is 7165 m2.The total area of the new house is 725 m2.The total area of the new house is 725 m2.The house is located on the ground floor of the house.The main house is partly equipped with a boiler room with a capacity of 230 kW.The main house is located on the ground floor of the house and is partly equipped with a boiler room.The main house has a capacity of 230 kW.The two additional units are located in the building, including two boilers with a capacity of 230 kW.The new house is located on the ground floor of the house.The house is partly equipped with a boiler room with a capacity of 2 m2.The new house is located on the ground floor of the house.The house is located on the ground floor of the house.