Description
We offer for sale land plots in the village of Nová Lesná, district Poprad. These are plots ranging in size from 699m² to 1157m². According to the town's zoning plan, these plots are designated for individual family home construction with two above-ground floors and an attic living space. The plot buildability is up to 25%, with a minimum plot size required for a single-family house being 600 m². Available utilities include electricity, water supply and sewerage, gas, fiber optic internet. Advantages: sunny location with beautiful views of surrounding nature including High Tatras as well as Kráľova hoľa Mountain and Poprad Town; tourist destination area. Access road and utility connections are currently under approval process after submission of application for building permit issuance.
The price includes already issued binding opinion (replaces planning permission) and ongoing building permits related to roads construction and all IS connections (public water supply network, sanitary sewage system, stormwater drainage system), relocation of HV power line within road structure, low voltage electrical distribution connection - 230V/400V - 32A circuit breaker rating; also included are gas pipelines installation rights, optical cable internet access provision works along public lighting installations on streets and sidewalks). Land prices:
Plot No.: Area [m²] --- Price [€] (price per sqm): Plot No.47: 1157 m² --- €150, €129/ m² Plot No.53: reserved Plot No.59: REZERVOVANÝ Plot No.66: REZERVOVANÝ Plot No.67: REZERVOVANÝ Plot No.68: REZERVOVANÝ Plot No.74: 780 m² --- €125, €160/ m² Not included in this price are costs associated with constructing roads infrastructure and utility networks estimated at approximately €35 thousand per lot each plus development fees set by local municipality authority charges towards National Park administration services connection fees together with other expenses connected directly either obtaining necessary permissions documents during project implementation phase itself until final completion stage reached regarding both mentioned aspects separately stated hereinabove accordingly.