Description
∷▶ VIDEO TOUR ♫▶ https://youtu.be/heoW4_8ppHw
A concrete plant in Svidník city located on Bardejovska street. Just 500 meters from the city center on the main road from Bardejov, which ensures excellent accessibility and visibility. Opposite there is a military monument and land prepared for construction of 38 family houses in the project named Jarabinky under the auspices of Svidník town hall. In close proximity there is a gas station called Stavbet open 24 hours with accommodation possibility. On western side there is an ice rink and water park Aquaruthenia. On western side industrial operations can be found.
Equipment:
• The land area fenced all around by sheet metal fence height of 2,0 m.
• Total area: 3442 sqm
• Paved hard surfaces (2701sqm), lot no. 569/17,578/12
• Recycling yard (38sqm), lot no. 578/14
• Gravel dump (190sqm), lots nos. 569/12 & 569/10)
• Concrete plant (control room, gravel dump, storehouse for concrete additives - together covering total area of 571 sqm)
• Weighbridge up to capacity of 60 tons
Energy supply: Connection to high voltage network, own well, Utility water
Concrete mix production equipment TMC50 • Manufacturer: Transunit Ltd., Bardejov • Year produced: May / June / July / August? [not clear] / September? [not clear]? [year unclear due to missing year number after month name] Certification TSUS
The structure consists of:
THM model THM series mixing machine,
Quadruple line aggregate hopper,
Cement storage container x2,
Weighing belt conveyor for aggregates,
Spiral cement conveyors ES-2x models,
Skip hoist unit,
Water weigher at load capacity of ?
Rails platforms supports stairs handrail systems installed throughout facility setup including water distribution system plasticizers dosers pneumatic air compressor control based computerized operation management system.